Construction of Current Facility

 

 

Site after dirt work.  The white dots are piers that were drilled to bedrock and filled with concrete.  The entire building was built with a pier/beam foundation.     This was the first wall section installed.  All of the sections were prefabricated and shipped in from out of state.

 

During the second week of wall installation.   Supports were needed to temporarily hold up the wall sections until all the sections were installed. 

 

Construction workers had to weld the panels together.   The panels were shipped in by truck.  They are so heavy that they could only be shipped one at a time.

 

     

 

    Photo taken from the the Highway 71 overpass.

 

     

 

     

 

     