Construction of Current Facility
|
|
|
|
| Site after dirt work. The white dots are piers that were drilled to bedrock and filled with concrete. The entire building was built with a pier/beam foundation. | This was the first wall section installed. All of the sections were prefabricated and shipped in from out of state. | |
|
|
|
|
| During the second week of wall installation. | Supports were needed to temporarily hold up the wall sections until all the sections were installed. | |
|
|
|
|
| Construction workers had to weld the panels together. | The panels were shipped in by truck. They are so heavy that they could only be shipped one at a time. | |
|
|
|
|
|
|
|
|
| Photo taken from the the Highway 71 overpass. | ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|